PBG and SLF Permit Assistance in Bali
Planning a new building or seeking permits for an existing one? We help owners of homes, villas, and commercial buildings in Bali prepare PBG and SLF applications, from the initial review through follow-up with the authorities.
PBG for planned construction, SLF for buildings ready for use
PBG (Building Approval) approves the technical plans for constructing, altering, expanding, reducing, or maintaining a building under the applicable rules. For new construction, the PBG is obtained before work begins. SLF (Certificate of Building Fitness for Use) confirms that a completed building meets the requirements for use after its fitness has been assessed. PBG replaced the IMB process for new applications; an existing IMB does not automatically need to be replaced.
We review the site and existing documents, help prepare drawings and technical materials, assist with submission through SIMBG, and address comments from the review. The documents and steps depend on the location, intended use, and condition of the building.
Initial Site and Zoning Review
Review the location, building use, and relevant spatial planning documents before determining the application requirements.
Administrative Documents
Check the owner’s identification, land documents, and other supporting materials required for the application.
Technical Building Drawings
Prepare or update design and as-built drawings to match the building and the application stage.
Building Inspection
Support inspections and follow-up on technical findings for an SLF application.
Inspection Checklist and Follow-up
Prepare inspection documents and help respond to reviewers’ comments.
Environmental Documents
Identify the environmental documents required for the activity and location.
How does the PBG and SLF process work?
Every building is different. We begin by reviewing its location, use, and available documents so the application route is clear from the start.
-
01
Consultation and Initial Review
Tell us where the building is, how it will be used, and whether it is planned or already built.
-
02
Document Preparation
We review ownership documents, design or as-built drawings, and other required materials.
-
03
Submission and Assessment
The application is submitted through SIMBG, with follow-up on verification notes or site inspections.
-
04
Follow-up to a Decision
We assist with revisions and follow-up until the relevant authority reaches a decision.
Want to see our work? View our PBG and SLF projects in Bali.
What should you prepare for a consultation?
Share the location, intended use, approximate floor area, construction status, and any land documents or drawings you have. If your documents are incomplete, tell us what is available so we can suggest the next steps.
Additional Services
Soil Testing and Cone Penetration Testing
Assess soil conditions and bearing capacity to inform structural design.
Billboard Permit
Assistance with commercial signage permits under the applicable local rules.
Electrical Operation Certificate (SLO and NIDI)
Electrical safety certification documents for new or existing installations.
KITAS - KITAP
Visa and residence permit assistance for foreign nationals planning a longer stay in Indonesia
NPWPD AT - ABT - SIPA
Assistance with local tax registration and groundwater use requirements.
General Contractor
Construction services for a range of buildings, from planning through completion.
Why Choose Pandara Prima?
Since 2024, we have supported more than 200 Indonesian and international clients with property investments in Bali.
Integrated Investment Services
Get support with property, design, permits, construction, business registration, and villa management.
Experienced Team
Our team helps you find solutions suited to each stage of your investment.
Time and Cost Efficiency
Planning and transparent project management help save time and keep investment costs under control.
Licensing and Compliance
We work to ensure that each permit meets applicable Indonesian requirements, helping reduce risk throughout your investment.
A Reliable Partnership
We listen to your needs, share clear updates, and help you decide what to do next as your plans develop.
Trusted by Clients and Partners
We work with clients and partners across Bali on property and business investment projects.
Frequently Asked Questions
Answers to common questions about the documents and steps for your building.
- For new construction or building alterations, apply for a PBG before construction begins.
- For a completed building that will be used, the SLF process follows an assessment of its fitness for use. An existing building without a PBG may apply for an SLF for an existing building; the PBG process may run alongside it under SIMBG requirements.
The timeline depends on document readiness, building conditions, required corrections, and the authorities’ review schedule. After checking the site and initial documents, we can explain the likely steps.
An existing IMB does not automatically need to be replaced with a PBG. If the building is complete and will be used, the need for an SLF depends on its function and condition. Changes to the building may also require a new technical approval. We can review the documents you already hold.
Our fees are generally paid in three or four stages, aligned with the progress of the permit application.
Contact Us
Tell us about your project or investment plans in Bali. Our consultants can help you identify the next steps.
-
Jalan Puri Buana I No. 11, Padangsambian, West Denpasar, Bali
Have a Question?
Our consultants can help you plan your next step. Get in touch to discuss your investment needs.